MinEx Associates Senior Associate

Hares Noori

A mining career across drilling, remote operations, underground engineering, project economics and computational research.

A career across the mining chain

From the drill line to the operating decision.

Hares Noori is a mining engineer and Senior Associate at MinEx Associates. Financial project assessment draws on technical evidence, operating assumptions and project economics. Hares’s work spans exploration drilling, equipment research, remote mine operations, underground technical services, automation studies and doctoral research, with experience using site context, engineering models and costed options.

In the mountains of Badakhshan, Afghanistan, he ran placer-gold mining operations across projects during the September 2025–July 2026 field-operation period, in the functional role of Technical Director – Mining at Jaihoon. The work included planning water capture and conveyance and adapting a staged transfer layout to pipe-sizing constraints.

Fieldwork and operations · 2017–2026

Reading the ground, then working with the operation.

His early experience as an Exploration Driller with MSJ Drilling Services involved surface diamond-core and reverse-circulation drilling for tungsten and quartzite exploration, at depths of up to 500 metres. He core-logged and produced three-dimensional block models in Leapfrog Geo. At Komatsu Ltd / Joy Global, he examined equipment performance across geological conditions, tested coal friability and evaluated the Opti-Drive system through parallel research contributions.

As Project Manager for PW Mining International in Nigeria, Hares managed work across two remote mining operations. He coordinated site teams, clients, communities and local authorities; one operation had a workforce of more than 150. At British Fluorspar, underground technical-services work included mine planning, stope design, ventilation, procurement and operating-system improvements, alongside planning-permission, regulatory and community matters.

Engineering choices · 2022–2023

Test the system before choosing the design.

At New Boliden’s Garpenberg mine, Hares prepared a costed ore-transport automation study that compared supplier pathways using haulage simulations and quotations. Separately, he contributed to a preliminary ore-pass expansion plan with the technical team, bringing site constraints and assumptions into early planning.

For his MSc thesis with Sandvik BU Automation, he designed underground mine layouts, connectivity and control-room configurations for load-and-haul automation simulation. That work connected mine geometry and operating workflows to the requirements of an automated system.

Economics and technical-commercial work · 2019–2025

Make the assumptions visible in the comparison.

Project economics has been part of Hares’s training and practice. His BEng dissertation was an academic Finnish-gold case study that traced supplied resource inputs through mining method, production schedule, capital and operating costs, discounted economics and sensitivity analysis. He has also developed independent placer-gold scenario economics.

In technical-commercial roles with DEWERCO & TSP, he developed proposals for mining modernisation and processing opportunities; these were proposals, not completed programmes. Later, with Celestium Gemlink, he worked on supplier outreach and UK import models for responsibly sourced gemstones, examining provenance, customs, sanctions and anti-money-laundering requirements, and routes to the London market.

Ventilation research · 2023 onward

A mine-wide network and local flow models.

Within EU Horizon Project REESOURCE, Hares led a 1.5-year ventilation work package for a planned rare-earth mine in Norway. He developed a mine-wide VentSim network model to examine airflow, pressure, resistance and extraction stages, and led local computational-fluid-dynamics work on flow distribution, mixing, recirculation and complex geometry. The two scales used consistent geometry, flow conditions and assumptions.

Since October 2025 he has been an independent PhD researcher in mine ventilation; the doctorate has not been awarded.

Independent mineral research and current affiliations

Organise the evidence before drawing a conclusion.

Through the Mining Research Unit / Placer Gold Research Group, Hares has compiled and source-checked a documented dataset of more than 40 mineral occurrences. He built a weighted Placer Suitability Index workflow in Python and QGIS; it is exploratory and has not been field-validated. His independent placer-gold scenario economics and research communication to mining and public-sector audiences extend the work from data organization to practical questions.

His career and study contexts span the UK, Nigeria, Afghanistan, Sweden, Finland, Germany and the Netherlands. He holds a BEng (Hons) in Mining and Minerals Engineering from Camborne School of Mines, University of Exeter, and the MSc European Mining Course delivered by TU Delft, RWTH Aachen University and Aalto University. His affiliations include Associate Membership of the Institute of Materials, Minerals and Mining (IOM3), the Camborne School of Mines Association and Young Mining Professionals Network UK.

Meet the team

Steve Canby · Principal Associate

Steve’s career story follows a different route through plant operations, commissioning, process work, project coordination and mineral assessment.

Read Steve’s profile

All MinEx people